
Menu
Chemical plant rubber production wastewater treatment project
Chemical plant rubber production wastewater treatment project
Water volume 1,500 CMD, water quality (1) COD 1,000 mg/L
Release water quality requirements: (1) COD ≦ 250mg/L

By visiting our site, you agree to our privacy policy regarding cookies, tracking statistics, etc. Read more
Water volume 1,500 CMD, water quality (1) COD 1,000 mg/L
Release water quality requirements: (1) COD ≦ 250mg/L
Guang Cheng Environmental Industry Co.,Ltd.,Committed to the research and development of wastewater technology, the establishment of a complete aerobic and anaerobic biological treatment technology in the field of sewage treatment, with an efficient modular combination structure. It eliminates the shortcomings of the traditional sewage treatment system, such as large floor space, difficult expansion, odor, and low performance.